© 2026 Western New York Public Broadcasting Association

140 Lower Terrace St.
Buffalo, NY 14202

Toronto Address:
130 Queens Quay E.
Suite 903
Toronto, ON M5A 0P6


Mailing Address:
Horizons Plaza P.O. Box 1263
Buffalo, NY 14240-1263

Buffalo Toronto Public Media | Phone 716-845-7000
BTPM NPR Newsroom | Phone: 716-845-7040
Differing shades of blue wavering throughout the image
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

Irondequoit Bay Outlet Bridge Reopens To Traffic On Tuesday

Monroe County DOT
Credit Monroe County DOT

The Irondequoit Bay Outlet Bridge reopens to vehicular traffic on Tuesday.

The bridge is located at the north end of Irondequoit Bay, and connects Culver Road in Irondequoit to Lake Road in Webster.  The seasonal swing bridge is designed to span the outlet for vehicle traffic during the winter months.

The schedule is set in accordance with permits issued by the Coast Guard.  Monroe County DOT plans to begin moving the bridge into place at about 7:00 a.m. on Tuesday.

It takes about a half hour to swing the bridge into place. There is a two-hour period, both leading up to the bridge movement and afterward to get things in place.

Copyright 2016 WXXI News

Randy Gorbman is WXXI's Director of News and Public Affairs. Randy manages the day-to-day operations of WXXI News on radio, television, and online.